Outcome CV™  (Commissioning Validation)

Our Outcome CV™ (Commissioning Validation) product takes the validation and commissioning processes into account, starting in the planning and design phase of a project. Outcome CV™ was developed by specialists from Syska Hennessy Group’s Commissioning Team along with Validation Team experts from BioMetics, Inc. By knowing what systems and equipment require validation, and exactly what the performance of those systems and equipment should be, a supporting commissioning plan can be developed early in the game. Uncovering problems before the validation process starts, means smooth sailing once it does.

Research Findings: There is confusion around start-up style commissioning and true commissioning in the industry today. While commissioning is an integral part of utilizing the building support systems and process systems, it is currently jammed in between the end of construction and beginning of validation. As a result, any commissioning that is performed does not support validation. Many firms are using in-house commissioning teams, who have limited experience. A myriad of problems are, consequently, uncovered during validation – further delaying and complicating this important process. Costs skyrocket and put pressure on an already strained budget. These costly delays also affect a drug’s speed to market, and eat away at valuable patent time.

In the chart shown below, we can see a comparison between anticipated costs (shown in black), and the unexpected additional costs (shown in red) when problems were not uncovered before the validation process began. This chart represents an actual case study of an East Coast pharmaceutical manufacturing facility. Note that the project time was extended from 8 months to 28 months before they could even start manufacturing their product.

How much does a flawed process cost?

Why We’re Different: We design, construct and operate facilities, making our commissioning method one of the most comprehensive in the industry. Outcome CV™ allows for a smooth hand-off of required documents to the validation team much sooner during a project. Where possible, tests can be performed jointly, eliminating duplication of testing and, in some cases, paperwork. The commissioning process has been redesigned to ensure more in-depth testing to wring out problems and make immediate changes while the construction team is still on-site. Problems are not uncovered late in the project, thus eliminating the costly time and money impacts seen in traditional commissioning and validation methods.

For further information on this process, please contact:

800.328.1600
Paul Liesman, PE, Senior Vice President
Markus Yakren, PE, Senior Vice President

 

Outcome CV™ - Commissioning ValidationOutcome E²C™ - Engineer to ConstructOutcome SRM™  - Security Risk Management
 
 


Home | Knowledge Center | Projects | News | Contact Us
Corporate Home |
Careers

© Copyright 2006, Syska Hennessy Group, Inc. All rights reserved.
Terms of Use Privacy Policy