Syska Hennessy Group
CRITICAL FACILITIES
    HOME KNOWLEDGE CENTER PROJECTS   NEWS CONTACT US CORPORATE HOME CAREERS  
PROJECTS
Design

Outcome E²C™

Commissioning

Healthcare

Technology
New York Presbyterian Hospital Data Center
PACS System
New York, New York
Exterior of the NY Presbyterian Hospital Exterior of New York Presbyterian Hospital

New York Presbyterian Hospital is one of the most comprehensive university hospitals in the world, with leading specialists in every field of medicine. The Hospital’s strong relationship with Syska Hennessy Group’s Healthcare Team prompted the Hospital to commission Syska’s Critical Facilities Team, the industry leader in the design and construction of critical and Hypercritical™ facilities, to conduct a reliability study and subsequently complete a schematic design for installation of their new GE PACS (Picture Archiving and Communications Systems) equipment.

PACS serve as secure databases for medical images, improving the efficiency of imaging departments by allowing digital information to be stored, recalled, displayed, manipulated and printed digitally.

Syska completed mechanical, electrical and structural schematic design documents for installation of their PACS system in both their 68th Street and 38th Street facilities. Working with the Hospital’s stakeholders, our Team completed a detailed cost analysis of both sites and determined the existing data center space located within their 1,400 sq. ft., 38th Street facility was the most cost effective selection for full design of the PACS installation.


Home | Knowledge Center | Projects | News | Contact Us
Corporate Home |
Careers

© Copyright 2007, Syska Hennessy Group, Inc. All rights reserved.
A member company of SH Group, Inc.
Terms of Use Privacy Policy