Syska Hennessy Group Critical Facilities Healthcare
PROFILEMARKETSSERVICESNEWSCAREERSCONTACT US
HOUSTON, TX
HOUSTON, TX

Brazosport Memorial Hospital

Rice University

Methodist Hospital San Jacinto

Rice University
Houston, TX
Rice University

Nanotechnology Lab, Dell Butcher Hall: Provide HVAC, Electrical and Plumbing construction documents for the existing ground floor lab and office renovation of approximately 1,715 SF as described in the Rice University Project Program Statement of Scope of Work to accommodate nanotechnology research with addition of RF shielded room and depressed experiment pits. Existing building infrastructure was adequate for renovation.

Bioinformatics Research Lab, M.D. Anderson Hall: Provide HVAC, Electrical and Plumbing construction documents for the existing 2nd floor labs and offices renovation of approximately 1,700 SF as described in the Rice University Project Program Statement of Scope of Work to accommodate Bioinformatics Research. The existing building infrastructure was inadequate for renovation and budget was tight. Design to meet Rice lab design criteria with fume hood and general room exhaust with a roof mounted high plume fume hood exhaust fan. Investigate existing building infrastructure, i.e., outside AHU, chilled water capacity and fume hood exhaust riser.

Nano-Materials Research and Testing Laboratory, Cox Engineering Hall: Provide HVAC, Electrical and Plumbing construction documents for the existing ground floor lab and office renovation of approximately 851 SF as described in the Rice University Project Program Statement of Scope of Work to accommodate Nano-Materials Research and Testing Laboratory. The existing building infrastructure was barely adequate for renovation and budget was tight. MEP design to a fixed limited budget was required. Re-use was to be made of as much as possible to limit costs. Preliminary design must be tailored to that end, attend required design and review meetings with Owner and User. Designed to meet Rice lab design criteria with fume hood and general room exhaust while reusing existing roof mounted upblast exhaust fan. Investigate existing building infrastructure, i.e., outside AHU, chilled water capacity and fume hood exhaust riser.

Computer Lab Renovation Sewell Hall: Renovation of existing class room areas 101, 101A, 101D, and 101F in Sewell Hall to provide A/V upgrades and computer work stations with surface mounted conduit for power and computer IT connections. The work will cover an area of construction of approximately 949 SF. The budget was tight and MEP design to a fixed limited budget was required. Re-use was to be made of as much as possible to limit costs. Above ceiling work was not performed due to presence of asbestos. Preliminary design must be tailored to that end, attend required design and review meetings with Owner and User. Design to meet Rice computer lab criteria. Investigate existing building infrastructure, i.e., large built-up dual duct basement AHU capacity and provide HVAC load calculation for proposed computer lab to determine adequacy of existing above ceiling HVAC system.



Profile | Markets | Services | News | Careers
Contact Us | Home

A member company of SH Group, Inc.
©Copyright 2008, SH Group, Inc. All rights reserved.
Terms of Use
Privacy Policy